A CRITICAL PATH METHOD APPROACH TO A GREEN PLATFORM SUPPLY VESSEL HULL CONSTRUCTION

Authors

  • EDA TURAN Yildiz Technical University
  • Mesut GUNER Yildiz Technical University

DOI:

https://doi.org/10.23055/ijietap.2013.20.7-8.916

Keywords:

Project Management, Production, Critical Path Method (CPM), Green Vessel, Platform Supply Vessel

Abstract

This study generates a critical path method approach for the first Green Platform Supply Vessel hull constructed in Turkey. The vessel was constructed and partly outfitted in a Turkish Shipyard and delivered to Norway. The project management of the vessel was conducted utilizing Critical Path Method (CPM) and the critical paths during construction and partly outfitting period of this sophisticated vessel were presented. Additionally, the precautions in order to prevent the delay of the project were discussed.

Author Biographies

EDA TURAN, Yildiz Technical University

Department of Naval Architecture and Marine Engineering

Mesut GUNER, Yildiz Technical University

Department of Naval Architecture and Marine Engineering

Published

2013-10-29

How to Cite

TURAN, E., & GUNER, M. (2013). A CRITICAL PATH METHOD APPROACH TO A GREEN PLATFORM SUPPLY VESSEL HULL CONSTRUCTION. International Journal of Industrial Engineering: Theory, Applications and Practice, 20(7-8). https://doi.org/10.23055/ijietap.2013.20.7-8.916

Issue

Section

Production Planning and Control